makeporngreatagain.pro
yeahporn.top
hd xxx

Practice Test 2 | Google Cloud Certified Professional Cloud DevOps Engineer | Dumps | Mock Test

3,910

Your organization has created three monitoring workspaces called dev-workspace, test-workspace and prod-workspace. The workspaces monitor the Projects outlined below:

  • dev-workspace: dev-1, dev-2, dev-3
  • test-workspace: test-1, test-2
  • prod-workspace: prod-1, prod-b and prod-c

You have been asked to monitor the project prod-1 alongside test-1 and test-2 in the same workspace.

How will you achieve this?

A. Move the prod-1 project to the test-workspace, this will delete it from prod-workspace.
B. The monitoring workspace of Projects cannot be updated after creation.
C. Merge test-workspace and prod-workspace.
D. Add the prod-1 project to the test-workspace and leave it in prod-workspace as well.

Correct Answer: A

  • Option A is CORRECT. A project can only be monitored by one workspace at any time.
  • Options B, C and D are incorrect. Monitoring workspaces of Projects can be updated after creation. Merging both workspaces will mean five projects being monitored in test-workspace instead of three.

Reference:

Comments are closed, but trackbacks and pingbacks are open.

baseofporn.com https://www.opoptube.com
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.